YOUR PROJECT
From your first sizes to a confirmed order.
See how to plan multiple steel windows or doors, request a quotation and confirm the final specification before manufacture.
3 minute read
Build your specification online, then obtain a confirmed quotation. No payment is taken in the planner.
1. Build your project list
Choose the steel system for each opening, add approximate overall frame dimensions and record the opening, glazing, finish and quantity. Keep separate line items where the sizes or specification differ.
Use the notes to describe the property, required performance and anything undecided. We can discuss supply only or installation with your project. Tell us who will measure and install so we can agree the responsibilities and scope clearly.
2. Plan your budget, then confirm your price
The cost page lets you enter your own rate for a budget calculation. That number is labelled as customer-entered; it is not an MQ offer, a supplier tariff or a checkout total.
Made-to-measure steel pricing depends on the approved system, fabrication, glass, hardware, finish and project requirements. We provide a confirmed quotation for the actual specification, including any agreed survey, delivery and installation.
3. Request and review your quotation
Send your project list with contact details and the delivery location. Keep the resulting reference with your drawings and subsequent correspondence. A submitted request starts the quotation process; it does not place a manufacturing order.
Review the proposed product, sizes, quantities, glazing build-up, finish, opening direction and inclusions. Ask for clarification before accepting any line that differs from your brief.
- Confirm the delivery charge, access requirements and installation scope.
- Confirm payment stages, production arrangements and the lead time in writing.
- Confirm the applicable product and installation warranty terms.
- Resolve any safety, fire, security, heritage or regulatory requirement before ordering.
4. Approve the final manufacturing specification
The final survey and fabrication information must be agreed before manufacture. Check each opening against the approved drawing and make sure changes to floors, finishes and structure have been incorporated.
Read the quotation and made-to-measure terms before you commit. Delivery, installation and any remedy for damaged or defective goods follow the agreed terms and your applicable statutory rights.
