The connection between your steel frame and your home matters. We plan the fixing, insulation, perimeter tapes and weather protection around the chosen system and the property.

Explore our approach to UK homes below. Installation availability, survey and finishing work are confirmed in your project quotation.

Conceptual section of a frame-to-wall joint: an internal airtight seal, central insulating fill and external weather seal. Mechanical fixing is separate from insulation.
The frame-to-wall connection
  1. 1Internal airtight seal
  2. 2Central insulation
  3. 3External weather seal
MQ illustration of an installation principle. Not to scale. Final profiles, fixings, membranes, support and drainage follow the applicable system instructions and agreed project details.View full-size drawing ↗

THREE FUNCTIONS. ONE CONTINUOUS CONNECTION.

More care around
the perimeter.

For external windows and doors, we select a compatible sealing arrangement for the frame, wall and exposure. It can use tapes, membranes, insulating fill and sealants; the detail determines the combination.

01

Inside: control air leakage

An appropriate airtight connection helps control unwanted draughts and links the frame to the building’s internal air-control layer. Its vapour-control properties are selected as part of the moisture design.

02

Centre: insulate the joint

Suitable insulating fill helps limit heat loss and sound transmission around the frame. The frame’s mechanical fixings, packing and support perform a separate job.

03

Outside: manage the weather

The outer connection resists wind-driven rain and links to the surrounding weather protection. Vapour behaviour, movement and drainage are considered together.

Continuity matters at corners and at the head, jambs and sill. Products are selected for joint size, adhesion, movement and the intended moisture behaviour—not simply because they are sold as “window tape”.

DESIGNED AROUND YOUR BUILDING

Different walls.
Different details.

A replacement opening in a period house can need a different approach from a new extension. We establish the construction before agreeing how the frame meets it.

Conceptual masonry cavity-wall jamb showing the outer leaf, insulated cavity, specified closer, inner leaf and frame connection. Internal airtight and external weather connections serve different functions.
A cavity-wall junction, in principle
  1. 1External weather connection
  2. 2Specified insulated closer
  3. 3Internal airtight connection
MQ illustration of an installation principle. Not to scale. Final profiles, fixings, membranes, support and drainage follow the applicable system instructions and agreed project details.View full-size drawing ↗

Cavity masonry

The perimeter seal is coordinated with the cavity closer, insulation and sill arrangement. We consider the existing damp-proof courses, cavity trays and weep paths where relevant, so the installation respects how the wall manages water.

Frame position, sound fixing locations and the connection to the internal finish are checked together. Work to the surrounding wall or cavity protection is identified in the agreed scope.

The tape is part of the junction. It cannot replace a missing or defective wall detail.

TRADITIONAL SOLID WALLS

Respect the existing fabric.

We assess the reveal, masonry condition, damp and existing finishes before selecting the connection. Reveal insulation and moisture compatibility need care, especially where the home has, or will receive, wall insulation.

For historic buildings, repair options, significance and any consent requirements should be considered before replacement is agreed.

TIMBER FRAME & FRAMED WALLS

Allow for the building to move.

The connection must suit the structural frame, external weather layer and internal air-control layer. Differential movement between timber and the outer skin can affect the joint; the proposed seals and support need to accommodate the assessed movement.

The wall designer’s requirements and the steel window instructions are reviewed together.

THE LOWER CONNECTION

Give water a
clear way out.

Window sills and outlets

We consider sill support, outward water shedding, end connections and the link to the wall’s moisture protection. The selected system’s drainage outlets must remain clear after sealing and finishing.

Unico XS Casement has a specific bottom-drainage detail. That connection is checked against its instructions rather than treated as interchangeable with another window.

External door thresholds

The exact threshold, structural support, insulation, waterproofing and internal and external finished levels are coordinated before ordering. Low thresholds may need a designed external drainage arrangement. Accessibility and weather exposure are considered together.

Conceptual window sill section showing separate support beneath the frame, an external sill shedding water away from the wall, and an internal air-seal connection. Frame outlets must remain unobstructed.
Support, sealing and outward drainage
  1. 1Separate load support
  2. 2Outward water path
  3. 3Internal airtight seal
MQ illustration of an installation principle. Not to scale. Final profiles, fixings, membranes, support and drainage follow the applicable system instructions and agreed project details.View full-size drawing ↗

OUR INSTALLATION PROCESS

Clear decisions.
Careful fitting.

We work to the applicable written manufacturer instructions and the agreed project detail. Missing information or conflicting requirements are resolved before that stage of work proceeds.

  1. 01

    Survey the opening

    Check the wall construction and condition, dimensions, access, exposure, existing support and finished floor levels. Identify preparatory work and any need for specialist design.

  2. 02

    Agree the detail

    Confirm the product, opening schedule, responsibilities, approval route and scope. Resolve the fixing, sealing, sill and threshold connections before the relevant work proceeds.

  3. 03

    Prepare and protect

    Check the delivered products and protect finishes. Prepare sound bonding surfaces, use primers where required and follow the materials’ temperature, moisture and application conditions.

  4. 04

    Support, fix and seal

    Set the frame to the required alignment with the specified support and fixings. Complete the insulating and sealing connections, with corners, movement and drainage addressed.

  5. 05

    Check the completed work

    Check operation, locking, alignment and seals within our scope. Review the accessible interfaces and keep required outlets clear. Agree which concealed stages are recorded before closing up.

  6. 06

    Hand over and support

    Explain operation and care, provide the applicable product information and record outstanding agreed work. Keep your MQ reference for any follow-up question or aftercare request.

Know what your quotation includes.

Survey, delivery, installation labour and materials are set out clearly. Removal, disposal, lifting, structural work, making good and decoration are included only where expressly listed. Additional work is discussed and priced before it proceeds.

Our aftercare approach ↗

BEFORE MANUFACTURE

Check the whole project.

A well-sealed joint is one part of the specification. We agree the relevant product and installation information, and who is responsible for any specialist design or approvals.

Building requirements differ across England, Wales, Scotland and Northern Ireland, and depend on the project and the rules applicable to it. Our Sutton-based service agrees installation location and scope by quotation. The England guidance linked below is not a single rulebook for every UK property.

For work in England, we agree responsibility for any Building Regulations notification and completion documentation before starting. Self-certification is available only through an installer registered for the relevant work; otherwise the appropriate Building Control route is considered.

Perimeter insulation does not turn a non-thermally-broken Presto frame into a thermally broken system. Internal doors and screens have their own support and operating requirements; they are not fitted as exterior weather-rated assemblies.

SUPPLY & INSTALL

One agreed scope.

Ask MQ to quote for the products and installation together. We confirm the survey, fitting method, materials, finishing work and handover included.

Request an installation quotation ↗

SUPPLY ONLY

Your installer is welcome.

Choose your own competent installer. We provide the relevant product information and agree survey, dimensions and supply responsibilities before ordering.

Discuss product and project support ↗

Product warranty and workmanship

We provide the applicable manufacturer warranty and care terms for the exact products ordered. Cover depends on those terms, including installation, use and maintenance conditions. Our installation workmanship terms, where we install, are agreed separately. Your statutory rights remain unaffected.

INSTALLATION QUESTIONS

Understand
the details.

Tell us about your property, your intended openings and the work already planned.

020 8770 7924
What makes a steel window installation more than a bead of sealant?

We consider structural fixing and support, insulation around the frame, the internal air seal and the external weather connection separately. Suitable tapes, membranes, primers and sealants are selected for the product and wall. Sills, thresholds and drainage complete the junction.

Do all UK homes need the same installation detail?

No. Cavity masonry, traditional solid walls and timber-frame construction need different connections. The survey considers the wall condition, frame position, exposure, existing moisture protection and movement. The chosen steel system’s instructions also apply.

Is expanding foam enough to install a steel window?

Insulating foam can form part of the joint when suitable for the specified detail. It does not replace the designed mechanical fixing and support, or by itself provide every required internal and external sealing function.

Will a more airtight installation affect ventilation?

It can. Uncontrolled gaps around a frame are different from planned ventilation. The replacement specification must consider the room and its ventilation strategy, including background ventilation where required. We confirm the relevant requirements before manufacture.

Can an external door threshold be completely level with the terrace?

A low or accessible threshold needs a coordinated design for the exact door, floor levels, support, waterproofing, exposure and drainage. A flush appearance alone does not establish weather performance. The proposed junction is reviewed before the door is ordered.

Can I buy the products and use my own installer?

Yes. We offer supply only. Before ordering, we agree who will survey, confirm final dimensions and review the installation detail. We provide the relevant product documents for your competent installer. Their installation workmanship remains within their agreed scope.

Does installation automatically guarantee the manufacturer warranty?

Warranty cover follows the applicable terms for the exact products, including any installation, use and maintenance conditions. We provide those terms and agree our own installation workmanship terms separately. Your statutory rights remain unaffected.

TECHNICAL DOCUMENTS

Explore the guidance.

These documents explain the product requirements and building principles behind the approach. Ask us for the instructions and detail applicable to your order.

Original MQ explanatory drawings. A surveyed and agreed detail is required for the actual installation.

Prepare for fitting. Know the next step.

Use our project checklist to review survey, site readiness and handover, then keep the relevant care information with your product documents.

Open the care guide & project checklist ↗

Bring the details together

One opening, or a whole project.

Choose a system, see the requested layout and bring your openings into one schedule. Choose supply only or an installation quotation from our Sutton team.

Plan your project